The Shimokotori Dam is a rock-fill dam on the Shimokotori River about 15 km (9.3 mi) west of Hida in Gifu Prefecture Japan. The primary purpose of the dam is hydroelectric power generation and water from its reservoir is diverted via a 8.5 km (5.3 mi) long headrace tunnel to a 142 MW power station northeast of the dam. The power station discharges the water into the Jinzū River. Construction on the dam began in 1970 and it was completed in 1973.
This page contains content from the copyrighted Wikipedia article "Shimokotori Dam"; that content is used under the GNU Free Documentation License (GFDL). You may redistribute it, verbatim or modified, providing that you comply with the terms of the GFDL.