Tags: Dam.

Uwada Dam is a gravity dam on the Tadami River 500 m (1640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.

Loading...

This page contains content from the copyrighted Wikipedia article "Uwada Dam"; that content is used under the GNU Free Documentation License (GFDL). You may redistribute it, verbatim or modified, providing that you comply with the terms of the GFDL.