Tags: Power Station.
The German wind farm developer Plambeck Neue Energien founded a Bulgarian Joint Venture in 2008. This Joint Venture actually develops several wind farm projects. The medium term target is to find wind farm sites with a capacity for wind turbines with a nominal output of together up to 250 MW with a capital investment required of up to US$ 450 million.