Tags: Power Station.
The 404 megawatt (MW) Peñascal Wind Farm is located in Kenedy County Texas and was completed in April 2010 by Iberdrola.The wind farm has 168 Mitsubishi MHI 92 wind turbines each with a capacity of 2.4 MW. The facility created some 20 direct jobs in maintenance and operation of the wind farms. Around 200 people were involved in its construction. Iberdrola received a $114 million treasury grant for the project as part of the stimulus funds that was released in September 2009.