The Mazar Dam is an concrete-face rock-fill dam on the Paute River Cañar Province Ecuador. The purpose of the dam is hydroelectric power generation and it is located directly upstream of the Paute Dam as part of the Amaluza-Molino project. The dam’s power station has an installed capacity of 170 MW. Construction on the dam began in 2004 the generators were commissioned in 2010 and the remaining works were completed in 2011.
This page contains content from the copyrighted Wikipedia article "Mazar Dam"; that content is used under the GNU Free Documentation License (GFDL). You may redistribute it, verbatim or modified, providing that you comply with the terms of the GFDL.