The Madison Avenue Line is a line of the Memphis Area Transit Authority trolley system. It began operating in 2004 and cost $56 million to build. Currently it operates 2.2 mi (3.5 km) of double track along Madison Avenue with six stops stretching into Midtown Memphis. The line was built to connect the Main Street system to the Medical District just east of Downtown Memphis though there are currently no connecting routes between the two lines.