Tags: Railway Line.
Line 2 is the main north-south line of Suzhou Rail Transit. The length of first phase is 26.557 km among them 6.57 km is elevated 19.146 km is underground and 0.67 km is open wide. The line’s first phase started from Suzhou North Railway Station(高铁苏州北站) and ended in Baodaiqiao South Station(宝带桥南站) near Baodai Bridge(宝带桥). The line go across five districts of Suzhou including 22 stations(17 underground 5 overhead). The first phase part will start operation in December 28 2013.