Tags: Power Station.

The Hwange Thermal Power Station is the biggest power plant in Zimbabwe with an installed capacity of 920 MW. It was built in two stages and consists of 4 units of 120 MW each and 2 units of 220MW each. Engineering Consultants Merz & McLellan were employed for the design and supervision of the construction of the power station. Construction of Stage 1 commenced in 1973 but was suspended in 1975 due to economic sanctions imposed on Rhodesia.

Loading...

This page contains content from the copyrighted Wikipedia article "Hwange Thermal Power Station"; that content is used under the GNU Free Documentation License (GFDL). You may redistribute it, verbatim or modified, providing that you comply with the terms of the GFDL.