Croton Dam (or Croton Hydroelectric Plant) is a dam and powerplant complex on the Muskegon River in Croton Township Newaygo County Michigan. It was built in 1907 under the direction of William D. Fargo by the Grand Rapids – Muskegon Power Company a predecessor of Consumers Energy. The 40-foot-high (12 m) dam impounds 7.2 billion U.S. gallons (6 billion imp. gal/27 billion L) of water in its 1209-acre (489 ha) reservoir and is capable of producing 8850 kilowatts at peak outflow.