Tags: Dam.

The Capanda Dam is a hydroelectric dam on the Kwanza River in Malanje Province Angola. The facility generates power by utilizing four turbines and 130 MW each totalling the installed capacity to 520 MW. The dam was constructed by Gamek a government body for a total cost of US$4 billion. An additional cost of more than US$400 million was spent in repairing the damage caused during UNITA’s occupation of the area at the time of the Angolan Civil War in 1992 and 1999.

Loading...

This page contains content from the copyrighted Wikipedia article "Capanda Dam"; that content is used under the GNU Free Documentation License (GFDL). You may redistribute it, verbatim or modified, providing that you comply with the terms of the GFDL.