Tags: Railway Line.
The Bloor–Danforth Line (officially route 2 Bloor–Danforth Subway) is a rapid transit line of the Toronto subway and RT operated by the Toronto Transit Commission (TTC). It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 25 1966 and extensions at both ends were completed in 1968 and again in 1980. It is also numbered as Route 2 (formerly route 601).The most travelled part of the line is located in Old Toronto’s midtown area known as Yorkville.