The Allington Quarry Waste Management Facility is an integrated waste management centre in Allington Kent. It is the site of the Allington Energy from Waste (EfW) Incinerator. The incinerator is owned by FCC Environment as Kent Enviropower. The facility which has involved an investment of over £150 Million is able to process 500000 tonnes per annum of waste and has the ability to produce 40MW of power.